Telescopic shoring props that carry slabs, beams and formwork while the concrete cures — then strike, stack and ship to the next floor, the next site, the next year.
Light · Medium · Heavy duty — Painted or hot-dip galvanised — Fork / U / flat heads
A prop is simple on purpose: nothing to service, nothing to lose but the pin — and ours is chained. What separates a prop that lasts a decade from one that bends in a season is the steel, the thread and the welds.
Industry-standard prop numbers and working ranges. Loads depend on extension — always confirm the load table for your configuration on the quote.
Prop No.
Closed
Open (max)
Outer tube
Inner tube
Typical use
No.0
1.05 m
1.80 m
Ø60
Ø48
Low slabs, trench & ceiling work
No.1
1.75 m
3.12 m
Ø60
Ø48
Standard floor-to-floor shoring
No.2
2.00 m
3.60 m
Ø60
Ø48
Taller residential & commercial floors
No.3
2.40 m
4.00 m
Ø60
Ø48
High ceilings, industrial floors
No.4
3.20 m
4.90 m
Ø60
Ø48
Back-propping & tall formwork
Typical industry ranges for guidance only — wall thickness, load capacity and finish are specified per order.
Reference photography from comparable projects and yards; your order is photographed before loading.
Fork / U / flat heads · Base & U-head jacks
What the prop pushes against decides the head. Flat plates for direct slab work, fork and U-heads to cradle timber or steel primary beams, and screw jacks where a beam line needs levelling rather than a full prop.
Send us floor-to-floor height, slab thickness and your pour cycle. We return a prop count by size and duty class — including the back-propping sets most quotes quietly leave out.
Never extend a prop beyond its rated open length, keep the load axial, and brace tall shoring. Every quote repeats the working range per size so your site team has it in writing.